Job 29689
Final inspectionPLACARD – MTOW / MLW PLACARD
Production traveller · task card 53005 · ACJ Centres · PO 635199
- Task card / line
- 53005 · line 2
- P/N ordered
- ACJC-0056
- ACJCENTRES-EO-ACJ32-11-0006
- Quantity
- 2
- SLX (shelf life expiry)
- —
- Earliest expiry of the materials used
- Operations
- 1 of 1 signed
- Laser engrave
- Due
- 26 Oct 2026
- Quality manual
- Made under IG001 Rev 10
Move to
Manufacture · operations from the part's process route
1/1 signed| # | Operation | Process spec | Operator | Signed | Date & time | |
|---|---|---|---|---|---|---|
| 1 | Laser Engrave | PS – to confirm | Lyndon Osborne | 06 Oct, 10:45pm |
Materials used · by IR number
SLX — = earliest expiry below| Part number | Material description | IR number | Expiry date | Batch | Quantity | By | |
|---|---|---|---|---|---|---|---|
| JURA-AL-05 | Jura anodised aluminium sheet 0.5 mm – satin silver | 51349 | n/a | JURA53V1839 | 1 sheet | Lyndon Osborne |
Type the IR number — supplier part number, description, batch and expiry fill in from the IR record.
Spares
Made beyond the order — goes into finished stock against this job with its SLX when the task card is released (or when a stock job is completed).
Operator & hold
QC & dispatch
Final inspection, the Form 1 and dispatch are done on the task card once all its jobs are through their operations.